Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective

Original Sheet No. 187 Original Sheet No. 187 : Effective

 

 

GENERAL TERMS & CONDITIONS

(Continued)

 

 

19. CONSTRUCTION OF NEW RECEIPT OR DELIVERY FACILITIES

 

19.1 Additional facilities to serve a Shipper may be constructed by

Sea Robin only with that Shipper's consent. In the event any

such facilities are installed by Sea Robin, Shipper shall, at

Sea Robin's option, exercised in a nondiscriminatory manner,

reimburse Sea Robin for the actual cost of any and all

facilities installed by Sea Robin pursuant to this Section 19

including, but not limited to, the cost of all labor,

materials, overhead expense and rights-of-way costs; provided

that Shipper shall repay Sea Robin, as invoiced by Sea Robin or

in kind at Sea Robin's option for any gas lost from Sea Robin's

pipeline as a result of the installation of such facilities.

If Sea Robin elects to invoice Shipper for such gas lost, the

charges will be equal to the volume of gas lost expressed in

Dth multiplied by the Index Price, as defined in Section 6.4

of these General Terms and Conditions, for the Month in which

the gas loss occurred.

 

19.2 Sea Robin, at its option, may submit progress billings to

Shipper for the partial payment of the accumulated construction

costs incurred by Sea Robin or for the advance payment of

construction costs estimated to be incurred by Sea Robin.

Shipper shall make payments within ten (10) calendar days after

Sea Robin has tendered such billings to Shipper pursuant to

this Section. Late payments shall be subject to Section 15 of

these General Terms and Conditions.

 

19.3 In the event Sea Robin agrees to permit Shipper, at Shipper's

expense, to install measurement and pipeline facilities at a

Sea Robin Point of Receipt or Delivery, Sea Robin shall have

the right to review and approve, prior to installation, design

and material specifications for such facilities. Sea Robin

shall also have the right to inspect such facilities during

construction and halt construction if (a) the construction is

performed in a manner inconsistent with approved practices or

could damage Sea Robin's facilities or (b) the construction or

materials deviate from the previously approved design or

material specifications.

 

19.4 To the extent Shipper is required to build facilities to

interconnect with Sea Robin's Pipeline System, such facilities

shall be in conformance with applicable U.S. Department of

Interior Materials Management Service regulations and shall be

subject to inspection and prior approval by Sea Robin.