Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective

Original Sheet No. 176 Original Sheet No. 176 : Effective

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

13. MEASUREMENT (Continued)

 

13.13 Installation of Flow Control Equipment

 

Sea Robin may elect to construct, install, and operate flow

control equipment at any location on its Pipeline System

whenever it determines in its reasonable judgment that such

equipment will contribute to the safe, reliable, efficient end

orderly operation of the Pipeline System.

 

13.14 Prior Period Adjustments

 

The deadline for closing measurement data shall be no later

than five (5) Business Days after the Month of flow. Any

measurement data or corrections received by Sea Robin

(including corrections to allocations) after it has closed the

previous Month of flow shall be handled as a prior period

adjustment. Sea Robin shall process late measurement data or

corrections of measurement errors under Section 13.10 as soon

as practicable but no later than six (6) Months after the

applicable Month of flow in question. The correction shall be

made to the Month of flow for allocation and billing purposes.

If Shipper disputes the measurement adjustment, it will have

three (3) Months after the prior period adjustment is made to

provide information that rebuts the adjustment. Excluding

government required rate changes and as otherwise provided

herein, no prior period adjustments of any kind shall be made

after six (6) Months following the invoiced Month for

transportation. These deadlines do not apply in the case of

deliberate omission or misrepresentation or mutual mistake of

fact. The parties' other statutory or contractual rights shall

not be diminished by this provision. Any prior period

adjustments not taken into account at the time of billing shall

not affect the calculation of the 80% throughput test under

Rate Schedule FTS-2.