Sea Robin Pipeline Company, LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective
Original Sheet No. 176 Original Sheet No. 176 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
13. MEASUREMENT (Continued)
13.13 Installation of Flow Control Equipment
Sea Robin may elect to construct, install, and operate flow
control equipment at any location on its Pipeline System
whenever it determines in its reasonable judgment that such
equipment will contribute to the safe, reliable, efficient end
orderly operation of the Pipeline System.
13.14 Prior Period Adjustments
The deadline for closing measurement data shall be no later
than five (5) Business Days after the Month of flow. Any
measurement data or corrections received by Sea Robin
(including corrections to allocations) after it has closed the
previous Month of flow shall be handled as a prior period
adjustment. Sea Robin shall process late measurement data or
corrections of measurement errors under Section 13.10 as soon
as practicable but no later than six (6) Months after the
applicable Month of flow in question. The correction shall be
made to the Month of flow for allocation and billing purposes.
If Shipper disputes the measurement adjustment, it will have
three (3) Months after the prior period adjustment is made to
provide information that rebuts the adjustment. Excluding
government required rate changes and as otherwise provided
herein, no prior period adjustments of any kind shall be made
after six (6) Months following the invoiced Month for
transportation. These deadlines do not apply in the case of
deliberate omission or misrepresentation or mutual mistake of
fact. The parties' other statutory or contractual rights shall
not be diminished by this provision. Any prior period
adjustments not taken into account at the time of billing shall
not affect the calculation of the 80% throughput test under
Rate Schedule FTS-2.