Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2007, Docket: RP07-683-000, Status: Effective

First Revised Sheet No. 148 First Revised Sheet No. 148 : Effective

Superseding: Original Sheet No. 148

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

8. IMPAIRMENT OF DELIVERIES

 

8.1 Service under Rate Schedules FTS and FTS-2 may be interrupted

or limited for reasons of force majeure or due to any other

repair and maintenance deemed necessary by Sea Robin, and Sea

Robin shall give Shipper notice where practical of such

interruption or limitation. Without limitation of the

foregoing, Shipper shall have the right to equitably reduce

receipts or deliveries of Natural Gas on any Day below the MDQ

to permit maintenance, repair, overhaul, replacement, or

construction of pipelines, compressors, metering, regulating,

or other production, Gathering, and transmission facilities

and equipment or due to facility maintenance or freeze offs.

 

8.2 In the event on any Day Sea Robin is unable to receive for

transportation or deliver the total MDQ of any Shipper

receiving service under Rate Schedules FTS and FTS-2, then the

Pipeline System capacity which is available for firm

transportation shall be in accordance with the priorities set

out in Section 4.6 hereof.

 

8.3 In the event that Sea Robin on any service day(s) is unable to

provide all or any part of Rate Schedule ITS service scheduled

pursuant to Section 4 of the General Terms and Conditions on

any one or more segment(s) of its Pipeline System, Sea Robin

shall interrupt such affected segment(s) to the extent

necessary in ascending sequence by rate up to the Maximum Rate.

Nothing herein shall require Sea Robin to interrupt or limit any

service of any priority, including service hereunder, if such

interruption or limitation would either not alleviate or would

exacerbate interruption or limitation of an equivalent or higher

priority service.