Sea Robin Pipeline Company, LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-470-000, Status: Effective
First Revised Sheet No. 133 First Revised Sheet No. 133 : Effective
Superseding: Original Sheet No. 133
GENERAL TERMS AND CONDITIONS
(Continued)
4. NOMINATIONS, SCHEDULING AND ALLOCATIONS (Continued)
(g) The NAESB timelines applicable to standard NAESB
predetermined allocation methodologies shall apply to any
additional predetermined allocation methodologies offered
by Sea Robin pursuant to the provisions of this
Section 4.9.
4.10 Predetermined Allocations at Points of Delivery
(a) Use of PDAs
On a daily basis at each Point of Delivery, Sea Robin shall
allocate any variances between scheduled nominations and
the quantities of gas metered at the point among the
quantities of gas scheduled at the point for the account of
its Shippers based on the Pro Rata PDA method unless
another PDA method is provided by the party that owns or
operates the downstream facilities interconnecting with Sea
Robin's facilities at each Point of Delivery (downstream
operator). The alternate PDA methodologies from which the
downstream operator may choose include the Swing PDA, a
Ranked PDA, a Percentage PDA, or Operator Provided Value
PDA. A new allocation detail may be needed when a
nomination changes. Shipper agrees that Sea Robin shall
have the right to rely conclusively on the PDA provided
pursuant to this Section 4.10 for the purpose of
determining the daily quantities of gas delivered by Sea
Robin for the account of Shipper at each Point of Delivery.
(b) PDA Deadlines
Each PDA must be submitted to Sea Robin by facsimile
machine or through Messenger during the confirmation of
that Day's nominations or after confirmation but prior to
start of gas Day; provided that any revisions to the PDA