Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective

Original Sheet No. 120 Original Sheet No. 120 : Effective

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

4. NOMINATIONS, SCHEDULING AND ALLOCATIONS

 

4.1 Nomination Procedures and Deadlines

 

(a) Deadlines

 

For each day on which service is desired under Sea Robin's

Rate Schedule FTS or Rate Schedule ITS, Shipper shall

nominate within MDQ the daily quantity of gas expressed in

Dth that it has available for transportation at each Point

of Receipt and the quantity of gas it desires to have

delivered at each Point of Delivery pursuant to the

provisions of this Section 4. Nominations must leave the

control of Shipper by 11:30 a.m. on the day preceding the

begin date of flow. Sea Robin must receive Shipper's

nomination (including from title transfer tracking service

providers) by 11:45 a.m. and provide Shipper with a quick

response by 12:00 noon on the day preceding the begin date

of flow. Additional requirements for the timely nomination

cycle are 3:30 p.m. for receipt of completed confirmations

by Sea Robin from upstream and downstream connected

parties; and 4:30 p.m. for receipt of scheduled quantities

by Shipper and point operator (on the day prior to flow).

In addition, Shipper may nominate gas under an evening

nomination cycle. Scheduled quantities for such evening

nomination cycle shall take effect at 9:00 a.m. on the next

gas day. For the evening nomination cycle, nominations

must leave the control of the nominating party by 6:00 p.m.

Sea Robin must receive Shipper's nomination (including from

title transfer tracking service providers) by 6:15 p.m. and

provide Shipper with a quick response by 6:30 p.m. on the

day preceding the beginning date of flow. Additional

requirements for the evening nomination cycle include 9:00

p.m. for receipt of completed confirmations by Sea Robin

from upstream and downstream connected parties; and 10:00

p.m. for Sea Robin to provide scheduled quantities to

affected shippers and point operators, and to provide

scheduled quantities to bumped parties (notice to bumped

parties), (on the day prior to flow). Nominations shall be

submitted through Messenger or via Electronic Data

Interchange (EDI) methods pursuant to the applicable NAESB