Sea Robin Pipeline Company, LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective
Original Sheet No. 119 Original Sheet No. 119 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
3. CONDITIONS OF RECEIPT AND DELIVERY (Continued)
3.12 Shipper shall deliver gas or cause gas to be delivered to Sea
Robin at the Point(s) of Receipt at a pressure sufficient to
allow the gas to enter Sea Robin's pipeline as such pressure
shall vary from time to time, but not in excess of Sea Robin's
maximum allowable operating pressure.
Sea Robin shall not be required to compress into its pipeline
gas transported under any of its Rate Schedules, lower its
system operating pressure, alter the direction of gas flow, the
gas load, or other operation or utilization of its facilities
or otherwise change its normal pipeline operations in order to
receive, transport or deliver gas hereunder. At each Point of
Receipt, Shipper shall provide, or cause to be provided,
equipment acceptable to Sea Robin which will prevent
overpressuring Sea Robin's pipeline.
3.13 Sea Robin shall deliver gas at each Point of Delivery to or for
the account of Shipper at the pressure which shall be available
from time to time in Sea Robin's pipeline after required
measurement, flow control and/or regulation.
3.14 Shipper must provide Sea Robin with all information required
for Sea Robin to comply with the Commission's reporting
regulations.