Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2004, Docket: RP05- 87-000, Status: Effective

Original Sheet No. 39 Original Sheet No. 39 : Effective

 

 

RATE SCHEDULE FTS-2

FIRM TRANSPORTATION SERVICE

(Continued)

 

 

(d) Prepayment

 

Requests for firm transportation hereunder must be

accompanied by a prepayment in the amount of the lesser of

the first three months' reservation charge or $500,000.

Unless Shipper elects otherwise, the prepayment of the

reservation charge shall be credited to Shipper's first

months of service or refunded following a determination

that Sea Robin is unable to provide service or the FTS-2

Agreement tendered to Shipper is not executed within 30

days.

 

(e) Certification of Title

 

Shipper must provide documentation or certification showing

with respect to the Committed Lease: (i) that it has good

title to the gas, that it has the requisite control of an

Affiliate's gas or that it has an effective contractual

right to acquire title for the life of the reserves; and

(ii) that it has entered into all necessary arrangements to

assure that the upstream and/or downstream transportation

will be in place prior to the commencement of service. Sea

Robin shall not be obligated to provide service at any

requested point of receipt or delivery without sufficient

information to support the certification made in (ii)

above.

 

4.2 On or before February 1 of each year Shipper's FTS-2 Agreement

is in effect, Shipper shall update its production profile to

support its MDQs and, when available, provide an actual

production history for its Committed Lease(s) and an update of

its technical data, which may be used by Sea Robin in

evaluating the reasonableness of Shipper's proposed MDQs for

each Delivery Period. Shipper shall reduce its MDQs as may be

appropriate based on the updated production profile throughout

the life of the lease. MDQs may be increased based on the

updated production profile only to the extent firm capacity on

the system is available and not previously committed to another

Shipper as determined by Sea Robin hereunder. If firm capacity

is not available, Shipper may request that such MDQ increase

supported by its production profile update be placed in Sea