Sea Robin Pipeline Company, LLC

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/2005, Docket: RP05-209-000, Status: Effective

First Revised Sheet No. 23 First Revised Sheet No. 23 : Effective

Superseding: Original Sheet No. 23

 

RATE SCHEDULE FTS

FIRM TRANSPORTATION SERVICE

(Continued)

 

 

provided in such General Terms and Conditions and Rate Schedule

FTS. Consistent with the provisions of this FERC Gas Tariff,

Sea Robin shall have the right to determine the priority and/or

scheduling of the transportation service under the FTS

Agreement. Consistent with the provisions of this FERC Gas

Tariff, Sea Robin shall also have the right to revise its

priority and/or scheduling of this transportation service from

time to time.

 

2.5 The Point(s) of Receipt for all gas tendered to Sea Robin for

transportation hereunder shall be at the interconnection of Sea

Robin's and Shipper's (or any third-party as may be applicable)

facilities, or at such other point(s), as specified in the FTS

Agreement. The Point(s) of Delivery for all gas delivered by

Sea Robin to Shipper (or to a third-party on behalf of Shipper)

related to service provided under this Rate Schedule FTS shall

be at the interconnection of Sea Robin's and Shipper's

facilities (or facilities of third-parties as may be

applicable), or at such other point(s), as specified in the FTS

Agreement.

 

2.6 Priority of Service

 

(a) The receipt of gas for transportation services performed

under this Rate Schedule shall be:

 

(1) on a firm basis for the primary Points of Receipt and

the secondary Points of Receipt located within the

Primary Path, shall not be subject to limitation or

interruption except as provided in Section 4.6 of the

General Terms and Conditions and shall have priority

over all of Sea Robin's interruptible services; and

 

(2) on a secondary firm basis for the secondary Points of

Receipt that are located outside the Primary Path and

shall be subject in Sea Robin's reasonable judgment to

the availability of excess capacity in Sea Robin's

Pipeline System. Receipt of gas under this Rate

Schedule at secondary Points of Receipt located

outside the Primary Path shall have a priority over