Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2003, Docket: RP03-611-000, Status: Effective
Original Sheet No.105 Original Sheet No.105 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
11.4 Posting Requirements for Capacity Releases Not Subject to
Bidding. For proposed capacity releases of a duration of thirty-one (31) Gas
Days or less for which the Releasing Shipper has obtained a Prearranged
Shipper and the Releasing Shipper elects not to post such capacity releases
pursuant to Section 11.3(a)(1). Such information will be posted on the
Pipeline's Internet Web Site as required by Section 11.3(a)(1). Contractual
arrangements for releases not subject to bidding shall be processed in the
same time period as those releases subject to bidding.
11.5 Allocation of Released Capacity.
(a) Pipeline shall select the Best Bid as defined in Section 11.5(d) from
among the bids received. However, if more than one bidder submits the Best
Bid, the first bidder in time, inclusive of the Prearranged Shipper, shall be
selected and posted as the Best Bid, unless the Releasing Shipper specifies
another tie-breaking methodology in the Releasing Shipper's Notice; provided,
however, that a Shipper exercising its right of first refusal is awarded
capacity in the event of tie bids; provided, further, that Pipeline may reject
any bid by a Shipper exercising its right of first refusal that is less than
the maximum rate.
(b) In the event a contingent bid is submitted pursuant to Section 11.2(l),
the Replacement or Prearranged Shipper submitting the contingent bid shall
have one hour from 2:00 p.m. CCT to 3:00 p.m. CCT on the day the Bid Period
ends to eliminate the contingency or withdraw its bid. If the Replacement or
Prearranged Shipper fails to notify Pipeline that the contingency is not
eliminated within such time, such contingent bid shall be deemed rejected by
Pipeline for failure to eliminate the contingency in accordance with the
releasing Shipper's Notice.