9.4 Interconnecting Pipeline OFOs. To the extent a directly interconnected
pipeline issues an OFO, Pipeline may concurrently issue an OFO. Although
notice and type shall follow the provisions in such interconnected pipeline’s
gas tariff, penalties shall be those enumerated in Pipeline’s Tariff.
9.5 The following provisions in Pipeline’s Tariff constitute OFOs or
critical periods on Pipeline’s system:
Notice Number Short Description GT&Cs Section
SCG-1 Hourly Market 8.3
Demand Exceeds Capacity
SCG-2 Unauthorized Daily 7.5-7.9
Overdeliveries and/or
Underdeliveries
SCG-3 Daily Shipper Imbalances 12.10
Threaten System Integrity
SCG-4 Daily Pool Receipt 13.5
SCG-5 Interconnected Pipeline OFO 9.4
9.6 Pipeline shall publish a report on its Internet Web Site as soon
as available, providing information about the reason for issuing the OFO, the
status of the operational variables that determine when an OFO is issued, the
Shippers affected, the time and date when the OFO will begin, when the OFO is
expected to end, explain why the OFO was issued and what specific actions are
required from the affected Shippers. The report will be updated when new
information is available. Additionally, Pipeline shall publish a final report
on its Internet Web Site, within three (3) business days from the date an OFO
is lifted, providing the details regarding an OFO.