Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2003, Docket: RP03-611-000, Status: Effective
Original Sheet No.90 Original Sheet No.90 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
(i) Normal Mode shall be implemented when system conditions do not warrant a
correction in flow, and when no known threat to system conditions exist.
(ii) Alert Mode shall be implemented when system conditions warrant a
correction in flow, or when a threat to system conditions exist.
(iii) Critical Mode shall be implemented when system conditions warrant a
prompt or immediate correction in flow or when an event has occurred or is
occurring that jeopardizes the Pipeline’s system integrity.
(c) When Pipeline changes the operating condition from Normal to Alert,
Alert to Normal, Alert to Critical, Critical to Alert, Normal to Critical or
Critical to Normal, Pipeline shall provide notice to its Shippers by posting
such change on the Pipeline's Internet Web Site. Notices to implement an OFO
under Section 9 or to change to or from a Critical Mode shall be delivered to
Shipper by the Pipeline's Internet Web Site pursuant to the terms of GT&Cs
Sections 29 and 36. Notices shall be given as soon as practicable but no
shorter than the notice periods set forth below:
(i) for Alert Mode Notice: at least 24 hours prior to the beginning of the
Gas Day to which the notice applies;
(ii) for Critical Mode Notice: at least 2 hours, unless an immediate response
is required for exigent circumstances prior to the effective time of the
notice. Such notice shall specify the beginning time of the OFO and such OFO
shall remain in effect until cancelled by Pipeline. In the notice Pipeline
shall specify the reason for the OFO and the expected conditions that would
cause release of the order.