Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2003, Docket: RP03-611-000, Status: Effective
Original Sheet No.87 Original Sheet No.87 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
In the event Shipper, without prior authorization by Pipeline, takes on any
Gas Day at any individual Delivery Point a quantity of gas which is greater
than Shipper’s applicable MDDQ or segment entitlement, then the quantity in
excess of the MDDQ or segment entitlement shall be Shipper’s Delivery Point
unauthorized daily overrun for such Gas Day and GT&Cs Section 7.5 shall apply.
(e) Updating Delivery Quantity. Pipeline shall file to
amend each affected Shipper’s Delivery Quantity to reflect any additional
flexibility provided by incremental capacity expansion projects after: (1)
Shipper and Pipeline have executed the agreement for such incremental service;
and (2) the incremental facilities related thereto have been constructed and
are ready for service.
8.2 INSTALLATION OF FLOW CONTROL EQUIPMENT
Pipeline may elect to construct, install, and operate flow control equipment
at any location on its pipeline system whenever it determines in its
reasonable judgment that such equipment will contribute to the safe, reliable,
efficient and orderly operation of its pipeline system in a manner that is
consistent with its obligation to provide service under all of its rate
schedules.
8.3 HOURLY RATES OF FLOW
(a) Uniform Flow Rates:
All gas delivered to or by Pipeline under its
transportation Rate Schedules shall be delivered at rates as constant as
operationally feasible throughout the day, and except as provided in Section
8.3(b) below, Pipeline shall not be obligated to deliver gas under its
transportation Rate Schedules in excess of uniform hourly rates.