Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2003, Docket: RP03-611-001, Status: Effective
Substitute Original Sheet No. 85 Substitute Original Sheet No. 85 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
The payment of a penalty for such daily
unauthorized underdelivered gas hereunder shall
under no circumstances be considered as giving
Shipper the right to not transport its
scheduled gas or be considered as a substitute
for any other remedy available to Pipeline
against the offending Shipper for failure to
stay within Shipper's applicable MDDO.
7.9 Scheduling Penalty. Shipper shall pay a
scheduling penalty for each Dt delivered at
Shipper's Delivery Point in excess of 102% of
scheduled quantities. The scheduling penalty
shall be the IT rate published on Sheet No. 7
multiplied by each Dt delivered at Shipper's
Delivery Point in excess of 102% of the
scheduled quantities. Shipper shall pay the
scheduling penalty in addition to any other
applicable charges and penalties.
7.10 Disposition of Penalties. All overrun and underdelivery
penalties collected by Pipeline during a calendar year, less the
amount collected for such overrun gas under Pipeline's Rate
Schedule IT rate per Dt multiplied by the total volume of overruns,
shall be directly refunded annually to each Non-Offending Shipper,
as set forth in GT&Cs Section 25 for the Month(s) in which such
penalties were incurred. Such refunds shall be distributed
pursuant to Section 25 of the GT&Cs.
8. MAXIMUM DAILY DELIVERY QUANTITY, INSTALLATION OF
FLOW CONTROL EQUIPMENT, AND HOURLY FLOW RATE