Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2003, Docket: RP03-611-000, Status: Effective
Original Sheet No.74 Original Sheet No.74 : Superseded
GENERAL TERMS AND CONDITIONS
(continued)
5.5 Upstream Confirmation Reductions. In the event that an upstream
operating entity’s confirmation, pursuant to Sections 4, 5.1 and/or 5.2
herein, reduces the scheduled quantities and such reductions are made in
aggregate for the Receipt Point, Pipeline shall reduce such quantities in a
corresponding amount on Pipeline's system based upon Shipper's ranking. To
the extent reductions in the confirmation process are applicable to a contract
(or to transactions within a contract that are charged the same percentage of
the maximum rate), Pipeline will use Shipper’s provided schedule ranks (in
accordance with NAESB defined data sets), or pro-rata if no ranks are provided
by Shipper, to effectuate such reductions to the scheduled quantities.
Pipeline shall not allow reductions below the elapsed pro-rata scheduled
quantity without the express consent of the affected party(s).
Elapsed-prorated-scheduled quantity means that portion of the scheduled
quantity that would have theoretically flowed up to the effective time of the
Intraday Nomination being confirmed, based upon a cumulative uniform hourly
quantity for each nomination period affected. Elapsed-pro-rata scheduled
quantity will apply to all nomination decreases submitted in the Intraday
Nomination cycles.
5.6 Segmentation. Shipper may segment its capacity by nominating receipts
or deliveries of gas on a primary point basis, subject to Sections 5, 6 and 11
of the GT&Cs. Shipper may segment its capacity by nominating receipt or
deliveries of gas at any available point on Pipeline’s system on a secondary
firm basis, subject to Sections 5, 6 and 11 of the GT&Cs. Deliveries will be
scheduled on a primary firm basis if utilizing Primary Receipt and/or Delivery
Points within Shipper’s capacity path and on a secondary firm basis if
utilizing Secondary Receipt and/or Delivery Points within Shipper’s capacity
path. Segmentation of capacity will be permitted to the extent the segmented
capacity would not impair Pipeline’s ability to render