Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-402-001, Status: Effective
Substitutefirst Revised Sheet No. 70A Substitutefirst Revised Sheet No. 70A : Superseded
Superseding: Original Sheet No. 70A
GENERAL TERMS AND CONDITIONS
(continued)
NAESB WGQ Version 1.7 standard 1.3.2 (iv)
verbatim: 5:00 pm for nominations leaving
control of the nominating party; 5:15 pm for
receipt of nominations by the transporter
(including from TTTSPs); 5:30 pm to send Quick
Response; 8:00 pm for receipt of completed
confirmations by transporter from upstream and
downstream connected parties; 9:00 pm for
Transportation Service Provider to provide
scheduled quantities to affected shippers and
point operators (central clock time on the gas
day). Scheduled quantities resulting from
Intraday 2 Nominations should be effective at
9:00 pm on gas day. Bumping is not allowed
during the Intraday 2 Nomination Cycle.
NAESB WGQ Version 1.7 standard 1.3.2 (v)
verbatim: For purposes of 1.3.2 ii, iii, and iv,
“provide” shall mean, for transmittals pursuant
to standards 1.4.x, receipt at the designated
site, and for purposes of other forms of
transmittal, it shall mean send or post.