Scg Pipeline Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-402-000, Status: Effective
First Revised Sheet No. 68 First Revised Sheet No. 68 : Superseded
Superseding: Substitute Original Sheet No. 68
GENERAL TERMS AND CONDITIONS
(continued)
NAESB WGQ Version 1.7 standard 1.3.2 (i) verbatim:
11:30 am for nominations leaving control of the
nominating party; 11:45 am for receipt of nominations by
the transporter (including from Title Transfer Tracking
Service Providers (TTTSPs)); noon to send Quick
Response; 3:30 pm for receipt of completed confirmations
by transporter from upstream and downstream connected
parties; 4:30 pm for receipt of scheduled quantities by
shipper and point operator (central clock time on the
day prior to flow).
Should Shipper fail to provide this nomination on or
before the nomination date, Pipeline shall deem
Shipper's nomination to be the scheduled quantity of the
previous Gas Day. Pipeline shall have the right to
refuse to receive or deliver any gas not timely and
properly nominated. A standing nomination may be
specified by Shipper to be effective for one or more
days or months provided the nomination beginning and
ending dates are within the term of Shipper’s applicable
Service Agreement. Pipeline shall not be liable to
Shipper or any other person as a direct or indirect
consequence of such refusal and Shipper shall indemnify
Pipeline from and against any and all losses, damages,
expenses, claims, suits, actions and proceedings
whatsoever threatened, incurred or initiated as a result
of such refusal unless such refusal was due to
Pipeline's gross negligence, undue discrimination or
willful misconduct.
5.2 Intraday Nominations
(a) Evening Nomination Cycle. Subsequent to the
Timely Nomination Cycle, as described in Section
5.1, Shipper may alter its nominations provided
that the nomination given by Shipper to Pipeline
for deliveries starting at 9:00 a.m. on the
following Gas Day shall be submitted to Pipeline
no later than the time specified in the nomination
timeline below, or such lesser period as is
acceptable to Pipeline. Any scheduling nomination
submitted after the Timely Nomination Cycle
described in Section 5.1 shall contain Shipper's
anticipated service requirements for one Gas Day
only and shall include the effective date and
time. Evening Cycle nominations shall span one
Gas Day and will not rollover or replace the
remainder of a standing nomination. The
nomination timeline shall be CCT on the day prior
to gas flow.