Sabine Pipe Line Company LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/31/1993, Docket: RS92- 78-003, Status: Effective
Original Sheet No. 442 Original Sheet No. 442 : Superseded
quantities for each Delivery Point set forth in Exhibit
B or in excess of the Maximum Daily Transportation
Quantity set forth in Exhibit B.
ARTICLE II
2. RECEIPT POINT(S), DELIVERY POINT(S) AND PRESSURES
2.1 The Receipt Point(s) at which Shipper shall cause gas
to be tendered to Sabine for transportation hereunder
are described in Exhibit A to this Service Agreement.
Other pertinent factors applicable to the Receipt
Point(s) are also set forth in Exhibit A.
2.2 The Delivery Point(s) at which Sabine shall deliver
thermally equivalent quantities of gas transported
hereunder, after appropriate reductions, are described
in Exhibit B to this Service Agreement. Other
pertinent factors applicable to the Delivery Point(s)
are also set forth in Exhibit B.
2.3 Shipper shall cause gas to be delivered to Sabine at
Receipt Point(s) at a pressure sufficient to allow the
gas to enter Sabine's System as such pressure shall
vary from time to time and place to place. Sabine
shall not be required to compress gas in order to
receive gas into its System.
2.4 Sabine shall deliver gas at each Delivery Point(s) for
the account of Shipper at the pressure which shall be
available from time to time in Sabine's System.
ARTICLE III
3. RATE(S), IT-1 RATE SCHEDULE AND GENERAL TERMS AND
CONDITIONS
3.1 Shipper shall pay Sabine for services rendered
hereunder in accordance with Sabine's IT-1 Rate
Schedule, or superseding rate schedule(s), on file with
and subject to the jurisdiction of the FERC and
lawfully in effect from time to time. The following