Sabine Pipe Line Company LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-109-001, Status: Effective
Original Sheet No. 278A Original Sheet No. 278A : Superseded
13.7 Prior Period Adjustments
The cutoff for the closing of measurement is five (5)
Business Days after the business month. Prior period
meter adjustments will be treated by taking the
adjustment back to the production month. Missing or
late measurement data will be estimated by the
measuring party, with the actual data then treated as a
prior period adjustment.
Measurement data corrections will be processed within
six (6) months of the production month, with a three
(3) month rebuttal period, in accordance with GISB
Standard 2.3.14. This standard shall not apply in the
case of deliberate omission or misrepresentation or
mutual mistake of fact. Parties other statutory or
contractual rights shall not otherwise be diminished by
this standard.