Sabine Pipe Line Company LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1998, Docket: RP98-265-000, Status: Effective
Second Revised Sheet No. 252 Second Revised Sheet No. 252 : Superseded
Superseding: First Revised Sheet No. 252
Service Pursuant to Award of Released
Capacity, for firm capacity released in accordance
with this Section 10, a Replacement Shipper may
subsequently release the capacity it has acquired
in accordance with the terms of this Section 10,
thereby becoming a Secondary Releasing Shipper. A
Secondary Release of capacity cannot operate to
release greater capacity rights than the capacity
acquired by the Secondary Releasing Shipper. To
the extent that a Secondary Releasing Shipper
acquired firm capacity subject to recall in
accordance with Subsection 10.2, the capacity then
released by the Secondary Releasing Shipper, and
any subsequent Secondary Release of the capacity
thereafter, shall also be subject to the right of
recall. A Replacement Shipper who is awarded firm
capacity under a Secondary Release shall be
required to execute a Confirmation Letter for the
released capacity at the rate bid by the
replacement shipper and accepted by the Releasing
Shipper up to the maximum rate and for the term
bid by the Replacement Shipper.
10.3 Term of Release
The minimum term for any release, whether permanent,
temporary, temporary subject to recall, or secondary is
one (1) day. The maximum term for any release shall be
the remaining primary term in the Releasing Shipper's
Firm Service Agreement.
As used in Subsection 10.4, a "month" is not a calendar
month. A month is a period of time beginning on a
numbered Day in one calendar month and continuing
through the previous numbered Day in the following
calendar month.