Sabine Pipe Line Company LLC
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/31/1993, Docket: RS92- 78-003, Status: Effective
Original Sheet No. 202 Original Sheet No. 202 : Superseded
GENERAL TERMS AND CONDITIONS
1. DEFINITIONS
The following terms, when used in this FERC Gas Tariff,
these General Terms and Conditions, or in any Service
Agreement executed for service under a Rate Schedule
contained in this FERC Gas Tariff, shall have the
following meanings:
1.1 Alternate Delivery Points
The point(s) on Sabine's System where quantities of gas
may be delivered by Sabine for the account of Shipper
under an executed Firm Service Agreement, as nominated
by Shipper.
1.2 Alternate Receipt Points
The point(s) on Sabine's System where quantities of gas
may be received by Sabine for the account of Shipper
under an executed Firm Service Agreement, as nominated
by Shipper.
1.3 Available Capacity
The quantitative ability of Sabine's existing system to
provide immediate maximum gas transportation service.
The ability of Sabine's System to provide maximum gas
transportation service may be limited by changes in
prevailing operating pressures, temperatures, gas flow
rates and gas flow directions within any portion(s) of
Sabine's System, including any receipt point(s) or
delivery point(s); physical capacity limitations of
compressors, regulators, valves, pipelines or pipeline
segments, measuring facilities or appurtenances to
Sabine's System; and necessary testing, maintenance,
repair, overhaul, alteration, modification,
replacement, enlargement, or construction of pipelines,
compressors, metering, regulating, and other
transmission facilities and equipment appurtenant to
Sabine's System.
1.4 Btu
British thermal unit and is equal to the quantity of
heat required to raise the temperature of one (1) pound
avoirdupois of pure water from fifty-eight and five