Sabine Pipe Line Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2000, Docket: CP00- 24-001, Status: Effective
Original Sheet No. 282 Original Sheet No. 282 : Effective
preparation of said records, or such other period as
shall be required by the FERC.
14.11 Properties and Facilities
Sabine shall only be responsible for the maintenance
and operation of its own properties and facilities and
shall not be responsible for the maintenance or
operation of any other properties or facilities
connected in any way with the transportation of gas.
14.12 Construction of Facilities
Unless otherwise agreed, Sabine will construct,
install, own, maintain and operate lateral pipelines
and metering facilities properly equipped with orifice
meters and other necessary measuring equipment required
to measure the quantities of gas received into Sabine's
System or delivered from Sabine's System. The metering
and regulating facilities are to be installed at a
location which, in Sabine's reasonable judgement, is
practical, convenient and readily accessible. The
Operator/Shipper shall provide the exhibits necessary
to support any needed FERC proceedings or permits
required by any other governmental agency. Unless
otherwise agreed, Sabine may require the
Operator/Shipper to contribute an aid-to-construction
amount to Sabine up to the cost of the facilities,
including all costs involved in the filing of
applications, pursuing approvals and obtaining all
licenses and permits required for transportation
services or construction, and further, amounts
necessary to reimburse any costs, including any income
taxes that may be incurred by Sabine as a result of the
aid-to-construction contribution. Shippers, whether
new or existing, shall bear all costs and expenses
attributable to the construction or acquisition of any
lateral pipelines or expansions of existing lateral
pipelines or measurement facilities.