Sabine Pipe Line Company LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2003, Docket: RP03-367-000, Status: Effective

Original Sheet No. 251C Original Sheet No. 251C : Effective

 

(b) Recall Notification Requirements(cont'd)

 

The recall notification provided to Sabine

should express the quantity in terms of

adjusted total released capacity entitlements

based upon the Elapsed Prorata Capacity

(NAESB WGQ 5.3.55)

 

Sabine will not be obligated to deliver in

excess of the total daily contract quantity

of the release as a result of NAESB WGQ

Standard No. 5.3.55. (NAESB WGQ 5.3.57)

 

In the event of an intra-day capacity recall,

Sabine will determine the allocation of

capacity between the Releasing Shipper and

the Replacement Shipper(s) based upon the

Elapsed Prorata Capacity (EPC). Variations

to the use of EPC may be necessary to reflect

the nature of Sabine's FERC Gas Tariff,

services, and/or operational characteristics.

(NAESB WGQ 5.3.56)

 

The amount of capacity allocated to the

Replacement Shipper(s) should equal the

original released capacity less the recalled

capacity that is adjusted based upon the

Elapsed Prorata Capacity (EPC) or other

Sabine FERC Gas Tariff specific variations of

the EPC in accordance with NAESB WGQ Standard

No. 5.3.56 [above]. (NAESB WGQ 5.3.58)

 

The Replacement Shipper should provide Sabine

with no more than two Internet E-mail

addresses to be used for recall notification.

The obligation of Sabine to provide

notification is waived until at least one of

the addresses has been provided. (NAESB WGQ

5.3.47)

 

Affected Replacement Shippers should manage

internal distribution of notifications of

recall received from Sabine. (NAESB WGQ

5.3.52)