Sabine Pipe Line Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-367-000, Status: Effective
Original Sheet No. 251C Original Sheet No. 251C : Effective
(b) Recall Notification Requirements(cont'd)
The recall notification provided to Sabine
should express the quantity in terms of
adjusted total released capacity entitlements
based upon the Elapsed Prorata Capacity
(NAESB WGQ 5.3.55)
Sabine will not be obligated to deliver in
excess of the total daily contract quantity
of the release as a result of NAESB WGQ
Standard No. 5.3.55. (NAESB WGQ 5.3.57)
In the event of an intra-day capacity recall,
Sabine will determine the allocation of
capacity between the Releasing Shipper and
the Replacement Shipper(s) based upon the
Elapsed Prorata Capacity (EPC). Variations
to the use of EPC may be necessary to reflect
the nature of Sabine's FERC Gas Tariff,
services, and/or operational characteristics.
(NAESB WGQ 5.3.56)
The amount of capacity allocated to the
Replacement Shipper(s) should equal the
original released capacity less the recalled
capacity that is adjusted based upon the
Elapsed Prorata Capacity (EPC) or other
Sabine FERC Gas Tariff specific variations of
the EPC in accordance with NAESB WGQ Standard
No. 5.3.56 [above]. (NAESB WGQ 5.3.58)
The Replacement Shipper should provide Sabine
with no more than two Internet E-mail
addresses to be used for recall notification.
The obligation of Sabine to provide
notification is waived until at least one of
the addresses has been provided. (NAESB WGQ
5.3.47)
Affected Replacement Shippers should manage
internal distribution of notifications of
recall received from Sabine. (NAESB WGQ
5.3.52)