Sabine Pipe Line Company LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2008, Docket: RP08-391-000, Status: Effective

First Revised Sheet No. 236 First Revised Sheet No. 236Superseding: Original Sheet No. 236 this Subsection, shall be limited to the transportation services confirmed and scheduled for such part or parts of Sabine's System.6.11 Notice of Curtailment Sabine will post notices of curtailment on its Internet web site (web site), and also, if appropriate, shall notify all affected Shippers as soon as practical and in a manner that is reasonable under existing conditions that a period of curtailment exists. Such notice shall set forth any limits on receipts or deliveries and the anticipated duration of such curtailment period. Upon notice of curtailment, Shipper shall adjust its receipts and/or deliveries of gas as specified by Sabine and make such adjustments within the time period specified by Sabine. Shipper compliance shall be a change in gas flow to the level specified by Sabine and will be evidenced by the confirmation of a flow rate change with an upstream or downstream Operator or the confirmation of the flow rate change by Sabine. Failure by any Shipper to adjust its receipts and/or deliveries within the time period specified by Sabine will result in the imposition of curtailment penalties assessed from the time Sabine notified the Shipper. Although a curtailment notice must result in an immediate change in gas flow, no penalties shall be assessed unless advance notice of curtailment is given at least forty- eight (48) hours before the curtailment is required by the order or Shipper does not initiate reasonable efforts to adjust the receipt and/or delivery of gas as required in the curtailment notice and order upon the receipt of such notice.