Sabine Pipe Line Company LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2008, Docket: RP08-391-000, Status: Effective

First Revised Sheet No. 230 First Revised Sheet No. 230Superseding: Original Sheet No. 2306.2 Scheduling of Pipeline Section Capacity Pipeline section capacity shall be scheduled in the following priority order (from highest to lowest): a) Nominations with a flow direction opposite of the physical flow direction in the pipeline section shall be scheduled first since these nominations potentially create capacity in the pipeline section. b) Nominations for firm transportation service. Sabine shall further prioritize nominations within this scheduling class as follows: i) In-Path, In-Direction ii) In-Path, Out-of-Direction iii) Out-of-Path c) Nominations for interruptible transportation service. Sabine shall further prioritize nominations within this scheduling class as follows: i) Maximum Rate After Sabine schedules firm transportation service pursuant to Subsection 6.2 b), any remaining capacity shall be scheduled to interruptible transportation service at maximum rate. Interruptible Shippers paying a Negotiated Rate that if higher than the maximum tariff rate for interruptible service, as set forth on the currently effective Sheet No. 20 of this FERC Gas Tariff, shall be afforded the same priority as if the service was at maximum rate.