Sabine Pipe Line Company LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 07/01/2008, Docket: RP08-391-000, Status: Effective

Third Revised Sheet No. 229A Third Revised Sheet No. 229ASuperseding: Second Revised Sheet No. 229A c) Nominations for interruptible transportation service. Sabine shall further prioritize nominations within this scheduling class as follows: i) Maximum Rate After Sabine schedules firm transportation service pursuant to Subsection 6.1 b), any remaining capacity shall be scheduled to interruptible transportation service at maximum rate. Interruptible Shippers paying a Negotiated Rate that if higher than the maximum tariff rate for interruptible service, as set forth on the currently effective Sheet No. 20 of this FERC Gas Tariff, shall be afforded the same priority as if the service was at maximum rate. ii) Less Than Maximum Rate After Sabine schedules interruptible transportation service pursuant to Subsection 6.1 c) i), any remaining capacity shall be scheduled to interruptible transportation service at less than maximum rate. Such capacity shall be scheduled first to Shipper(s) paying the highest percentage of maximum rate, then to Shipper(s) paying the next highest percentage of maximum rate. Sabine shall continue this process until all capacity at the point is scheduled.