Sabine Pipe Line Company LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2006, Docket: RP06-582-000, Status: Effective
First Revised Sheet No. 20A First Revised Sheet No. 20A : Effective
Superseding: Original Sheet No. 20A
1/ Section 154.107(f) of the Commission's Regulations requires
a total rate. For this purpose only, a Daily Reservation
Charge which equals the Monthly Reservation Charge divided
by 30.4167 (365 days/12 months) is reflected.
For capacity release transactions at maximum rate, the
Monthly Reservation Charge is divided by the number of days
in the applicable month. For less than maximum rate
transactions only, converting daily rate to monthly rate is
accomplished by multiplying the daily rate times number of
days in rate period, dividing the result by number of
months in rate period and taking the remainder out to 5
decimal places and rounding up or down to the fourth
decimal place. Converting a monthly rate to a daily rate
is accomplished by multiplying the monthly rate by the
number of months in rate period; dividing the result by
number of days in rate period and taking the remainder out
to 5 decimal places and rounding up or down to the fourth
decimal place.
2/ For the period during which this ACA Rate is effective, it
is Sabine's intent not to seek recovery of any annual
charges assessed Sabine pursuant to Part 382 of the
Commission's regulations and FERC Order No. 472, except as
permitted under this ACA Rate. This ACA surcharge is in
addition to any amounts otherwise payable to Sabine under
its Rate Schedules.
3/ Refer to Sabine's website (www.sabinepipeline.com) for a
listing of Receipt Points and Delivery Points in each
section of Sabine's pipeline system.