Portland Natural Gas Transmission System

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2006, Docket: RP06-449-000, Status: Effective

Original Sheet No. 317 Original Sheet No. 317 : Effective

 

GENERAL TERMS AND CONDITIONS (Continued)

 

4. GENERAL SERVICE CONDITIONS

 

4.1 Facilities to be in Place Prior to Request. Transporter shall not

be required to render service on behalf of any Shipper in the event that all

facilities necessary to render such service do not exist at the time such

service is requested.

 

4.2 Shipper to Comply with all Terms. Transporter shall not be

required to render service on behalf of any Shipper which on any Day fails to

comply with any or all of the terms of the Gas Transportation Contract(s), the

applicable Rate Schedule, or the General Terms and Conditions, provided,

however, that prior to stopping service to a Shipper, Transporter shall notify

the Shipper in accordance with the notice procedure outlined in Section 23.4

herein.

 

4.3 Form of Agreement. Transporter and Shipper shall execute a Gas

Transportation Contract covering the service contemplated. The executed Gas

Transportation Contract and any applicable schedules, exhibits and

attachments, together with the General Terms and Conditions and applicable

Rate Schedules, shall constitute the entire agreement between the parties for

service provided therein and shall be modified only by written amendment.

 

4.4 Order of Discounts. To the extent Transporter discounts the rates

applicable for service under any Gas Transportation Contract under Rate

Schedules in Transporter's FERC Gas Tariff, the amount of any such discount

shall be accounted for as a reduction of maximum rates in the following

sequence to the extent any of the following components are included in the

maximum rate. The first item discounted shall be trackable rate components

(other than the ACA charges), if any, to the extent not otherwise agreed to in

approved settlements then followed by the base rate (maximum less minimum rate

and excluding the trackable rate components cited above.)