Pine Prairie Energy Center, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2007, Docket: RP07-563-000, Status: Effective
Original Sheet No. 243 Original Sheet No. 243 : Effective
Exhibit A to the Interruptible Loan Service Agreement
between PPEC and
____________________(Customer)
dated __________
Effective Date or Event: ______________________________________
Loan charge _________________________
Loan injection charge _________________________
Loan withdrawal charge _________________________
Fuel reimbursement _________________________
Effective Date or Event: ______________________________________
Loan charge _________________________
Loan injection charge _________________________
Loan withdrawal charge _________________________
Fuel reimbursement _________________________
Notes:
1. The charges for a specified period shall remain in effect
until the conclusion of the Gas Day preceding the date or event
specified as the date or event on which revised charges are to
become effective.
2. Additional lines may be added if PPEC and Customer agree to
more than two sets of date ranges defining specific charges.