Pine Prairie Energy Center, LLC

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2007, Docket: RP07-563-000, Status: Effective

Original Sheet No. 215 Original Sheet No. 215 : Effective

 

Exhibit A to the Firm Parking Service Agreement

between PPEC and

____________________(Customer)

dated __________

 

Point(s) of Receipt and Point(s) of Delivery:

Maximum Daily Receipt Quantity ("MDRQ")

Maximum Daily Delivery Quantity ("MDDQ")

 

MDRQ MDDQ

 

ANR Pipeline Company (SE): _______ _______

 

ANR Pipeline Company (ML2): _______ _______

 

Texas Gas Transmission, LLC (SL): _______ _______

 

Florida Gas Transmission Company (zone 2): _______ _______

 

Transcontinental Gas Pipe Line Corp. (zone 3): _______ _______

 

Texas Eastern Transmission, LP (WLA): _______ _______

 

Tennessee Gas Pipeline Company (zone L, 800 leg): _______ _______

 

 

 

Columbia Gulf Transmission Company (mainline): _______ _______

 

________________________________________: _______ _______

 

________________________________________: _______ _______

 

 

 

Note: Add as many additional Point(s) of Receipt and Point(s)

of Delivery as necessary. Any point with an MDRQ and/or MDDQ that

is greater than zero (0) is considered to be a Primary Point. All

other points are to be considered Secondary Points.