Pine Prairie Energy Center, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2007, Docket: RP07-563-000, Status: Effective
Original Sheet No. 142 Original Sheet No. 142 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
11. PRESSURE AND INJECTION/WITHDRAWAL RATES
11.1 Delivery Pressures. PPEC shall deliver Gas to
Customer at pressures sufficient to enter the pipeline facilities
at the Point(s) of Delivery against the operating pressures
maintained by Transporter(s) from time to time. PPEC shall not be
required to deliver Gas at pressures in excess of those required
by Transporter(s) or in excess of Transporter(s) maximum allowable
operating pressure (MAOP), not to exceed 1,200 psig. Customer
shall deliver or cause to be delivered to PPEC all Gas for
wheeling, parking or injection at the Point(s) of Receipt at
pressures not less than 750 psig and not in excess of the MAOP of
PPEC's facilities at the Point(s) of Receipt. PPEC shall be
responsible for maintaining facilities at such Point(s) of Receipt
to permit Customer to deliver Gas to PPEC at such allowed
pressures.
11.2 Receipt and Delivery Rates. PPEC has designed the
facilities required to wheel, store, inject and withdraw Gas based
on "normal" operating pressures maintained by the Transporter(s)
at the Point(s) of Receipt/Delivery with allowances for reasonable
fluctuations. In the event that conditions on the Transporter's
system vary substantially from this "normal" design condition
coincident with high levels of Customer receipt or delivery
activity, PPEC's capability to receive or deliver the quantities
set forth in its Storage Service Agreements may be impaired,
resulting in an interruption in service. If this happens,
capacity will be allocated pursuant to Section 5 of the General
Terms and Conditions of this FERC Gas Tariff. Customer agrees to
indemnify and hold PPEC harmless for any loss caused by any such
interruption in service.