Pine Prairie Energy Center, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/20/2009, Docket: RP09-237-000, Status: Pending
First Revised Sheet No. 114 First Revised Sheet No. 114
Superseding: Original Sheet No. 114
GENERAL TERMS AND CONDITIONS
(Continued)
CAPACITY RELEASE
Any Customer under Rate Schedules FSS, FP or FL may seek to
release to others any or all of its firm service entitlements on a
full Day or an intraday basis, on a permanent or a temporary
basis, and on a firm or recallable basis, subject to the following
terms and conditions:
4.1 Notice of Offer. A Customer offering to release firm
service entitlements shall post the terms of its proposed release
on PPEC's Internet Web Site by the posting deadline as determined
pursuant to Section 4.3 herein. If Customer is unable to post
such information on PPEC's Internet Web Site, Customer shall
notify PPEC via the Internet Web Site of the terms of its offer,
by the posting deadline as determined pursuant to Section 4.3
herein, and PPEC will post this information on the Internet Web
Site. The Customer may propose a designated Pre-arranged
Replacement Customer to which the capacity would be released.
Offers shall be binding unless written or electronic notice of
withdrawal is received by PPEC prior to the close of the
applicable bid period; provided, however, such withdrawal shall
only be valid if such Customer has an unanticipated requirement
for such capacity and no minimum bid has been made. The notice
must contain the reason for withdrawal which PPEC shall post on
the Internet Web Site. The offer shall contain the following
minimum information:
(a) Customer's legal name and the name/title of
individual who has authorized the offer to release;
(b) PPEC's Storage Service Agreement number;
(c) A description of the capacity to be released,
including the Maximum Storage Quantity, Maximum Park Quantity or
Maximum Loan Quantity, as applicable, and the Maximum Daily
Receipt Quantity, the Maximum Daily Delivery Quantity, the Maximum
Daily Injection Quantity, and the Maximum Daily Withdrawal
Quantity and the associated Point(s) of Receipt and Point(s) of
Delivery (Replacement Customer may request changes to such Receipt
and Delivery Point(s) subject to the proposed release and subject
to the daily quantity limitations described in Section 4.2 below);
(d) The proposed effective date and term of the
release;
(e) The identity of any designated Pre-arranged
Replacement Customer (pursuant to Section 4.4), a statement as to
whether the Pre-arranged Replacement Customer is an asset manager
(as defined by FERC regulations at 18 C.F.R. 284.8(h)(3)) or
marketer participating in a state-regulated retail access program
(as defined by FERC regulations at 18 C.F.R. 284.8(h)(4)), and
the full terms of such pre-arranged release;
(f) The method to be applied in evaluating bids,
allocating capacity and breaking ties, as described below;
(g) Whether, to what extent, and the conditions
pursuant to which capacity will be subject to recall for a full
Day or a partial Day; if recallable, (1) whether the Releasing
Customer's recall notification must be provided exclusively on a
Business Day, and (2) any reput methods and rights associated with
returning the previously released capacity to the Replacement
Customer;