Panther Interstate Pipeline Energy, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2004, Docket: CP03-338-001, Status: Effective
Original Sheet No. 22 Original Sheet No. 22 : Effective
the requesting party if the measuring equipment tested is
found to be in error not more than two percent (2%).
(b) If, upon testing, any measuring equipment is found to be in
error by not more than two percent (2%), previous recordings
of such equipment shall be considered accurate in computing
deliveries of gas, but such equipment shall be adjusted at
once to record accurately.
(c) If, upon test, any measuring equipment shall be found to be
inaccurate by an amount exceeding two percent (2%), at a
recording corresponding to the average hourly rate of flow
for the period since the last preceding test, then any
previous recordings of such equipment shall be corrected to
zero error for any period that is known definitely, but in
case the period is not known or agreed upon, such correction
shall be for a period extending over one-half of the time
elapsed since the date of the last test, not exceeding a
correction period of sixteen days.
5. QUALIFICATION FOR SERVICE
5.1 Request for Service: All Shippers requesting firm transportation
service or interruptible transportation service must provide the
applicable information required by this Section 5 in order to
qualify for service. Requests must be provided by a means
consistent with Section 16 of these General Terms and Conditions.
Any material modification, in whole or in part, of an existing
transportation service shall be requested by Shipper's submission
of a new request for service with a notation that the service
requested is a modification of an existing service. No request
for service will be processed until a completed request on a form
provided by Transporter has been submitted by Shipper to
Transporter consistent with this Section 5. Transporter shall not
be obligated to accept a request which has been submitted more
than ninety (90) days prior to the proposed effective date, but
may do so on a non-discriminatory basis or where additional
facilities are required.
5.2 Required Information: Any request shall include the information
listed below. Shipper shall provide any additional information
reasonably required by Transporter to process the request;
provided that the request for additional information shall not
affect the priority of Shipper's request.