Panther Interstate Pipeline Energy, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2004, Docket: CP03-338-001, Status: Effective
Original Sheet No. 6 Original Sheet No. 6 : Effective
net present value of incremental revenue under the respective
requests, reflecting volume, term, and the minimum rate
Transporter will accept for the service. If a request is not
accepted by Transporter within ten (10) days, it is deemed denied.
3.4 Applicability of Tariff: Submission of a request for service
hereunder shall be deemed agreement by Shipper that it will abide
by the terms and conditions of this Rate Schedule, including the
applicable General Terms and Conditions, if awarded capacity.
4. DELIVERIES AND RECEIPTS
4.1 Receipt Points: Primary receipt point(s) for all gas transported
by Transporter under this Rate Schedule shall be at the mutually
agreeable interconnection(s) between Transporter's system and the
connecting facilities shown on Exhibit A to the FT Agreement,
consistent with Section 5.2 of the General Terms and Conditions of
this Tariff. Transporter shall not be required under any
circumstances to receive gas at any receipt point where: (1) the
total quantity of gas scheduled for receipt of any Day is less
than that required for the accurate measurement of quantities to
be received; (2) Shipper has failed to make and properly implement
all necessary arrangements on upstream entities; or (3) Shipper
has failed to nominate such quantities consistent with Section 9
of the General Terms and Conditions of this Tariff.
4.2 Delivery Points: Primary delivery point(s) for all gas
transported by Transporter under this Rate Schedule shall be at
the mutually agreeable interconnection(s) between Transporter's
system and the connecting facilities shown on Exhibit B to the FT
Agreement, consistent with Section 5.2 of the General Terms and
Conditions of this Tariff. Transporter shall not be required
under any circumstances to deliver gas at any delivery point
where: (1) the total quantity of gas scheduled for delivery on
any Day is less than that required for the accurate measurement of
quantities to be received; (2) Shipper has failed to make and
properly implement all necessary arrangements on downstream
entities; or (3) Shipper has failed to nominate such quantities
consistent with Section 9 of the General Terms and Conditions of
this Tariff.
4.3 Changing Primary Receipt and Delivery Points: Subject to the
availability of firm point and segment capacity and the agreement
of Transporter, Shipper may change the primary receipt or delivery
points under its FT Agreement (including redistributing the MDQ
among points) by an amendment of Exhibit A or B to the FT