Panhandle Eastern Pipe Line Company, LP
THIRD REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/30/2004, Docket: RP04-321-000, Status: Effective
Original Sheet No. 584 Original Sheet No. 584 : Effective
RATE SCHEDULE WS (Continued)
WINTER STORAGE SERVICE
FORM OF STORAGE AGREEMENT
1.2 In each year of the term of this Storage Agreement, Shipper
may elect to retain a portion of its Stored Volume as carry-over
volume (Carry-over Volume) to be left in storage during the
succeeding Summer Period and withdrawn in the succeeding Winter
Period. Shipper may so retain up to 20% of its Maximum Stored
Quantity for such carry-over without penalty. In the event the
retained Carry-over Volume exceeds 20% of its Maximum Stored
Quantity, Shipper shall be subject to an additional percentage
retention of Gas as set forth in Section 1.3. The sum of the
Carry-over Volume and the volumes delivered by Shipper for storage
during any Summer Period shall not exceed Shipper's Maximum Stored
Quantity set forth in Section 1.1 of this Storage Agreement.
1.3 Shipper agrees to furnish, in addition to volumes delivered
into storage, a volume of Gas equal to the percentage set out in
effective Tariff Sheet No. 11 of such volumes delivered for injection
into storage in each year of the term hereof to be retained by
Panhandle for use as compressor fuel, plus an additional volume of
Gas equal to the percentage set out in effective Tariff Sheet No. 11
of volumes delivered to Shipper in each year of the term hereof to be
retained by Panhandle for use as compressor fuel. No compressor fuel
need be furnished for volumes carried over from any Winter Period
unless Shipper retains more than 20% of its Maximum Stored Quantity
in any year as Carry-over Volumes. In such event, pursuant to
Section 1.2, such Carry-over Volumes in excess of 20% of Shipper's
Maximum Stored Quantity shall be subject to a .25% additional
compressor fuel retention by Panhandle.
1.4 Panhandle shall receive from Shipper and inject into
storage each Month during the Summer Period Gas as nominated pursuant
to the General Terms and Conditions.
1.5 Where Shipper has designated as the WS Point a point not
located on Panhandle's system, then the maximum quantities for
injection and withdrawal on any Day shall be subject to any
restrictions or other limitations applicable to the lease or storage
agreement between Panhandle and the owner or operator of the storage
facility, in addition to the restrictions and limitations of this
agreement and Rate Schedule WS.