Panhandle Eastern Pipe Line Company, LP
THIRD REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/30/2004, Docket: RP04-321-000, Status: Effective
Original Sheet No. 328 Original Sheet No. 328 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
20. FORCE MAJEURE
In the event, to the extent, and for so long as either Panhandle
or Shipper is unable, by reason of force majeure, to carry out its
obligations hereunder, in whole or in part, the obligations of either
of Panhandle or Shipper, other than to make payment of reservation
fees or capacity charges which shall become due, shall be suspended,
in whole or in part, and neither Panhandle nor Shipper shall be
liable in damages to the other as a result of Force Majeure. "Force
Majeure," as employed herein, shall mean any cause, whether of the
kind herein enumerated or otherwise, not within the control of either
Panhandle or Shipper claiming suspension, and which by the exercise
of due diligence, either Panhandle or Shipper has been unable to
prevent or overcome, including without limitation acts of God, the
government including the issuance of rules or orders which serve to
frustrate or prevent the performance of Panhandle, or a public enemy;
strikes, lockouts, or other industrial disturbances; wars, blockades,
or civil disturbances of any kind; epidemics, landslides, hurricanes,
washouts, tornadoes, storms, earthquakes, lightning, fires,
explosions, arrests, and restraints of governments or people;
freezing of, breakage or accident to, or the necessity for making
repairs or alterations to wells, machinery or lines of pipe; partial
or entire failure of wells; and the inability of either Panhandle or
Shipper to acquire, or the delays on the part of either of Panhandle
or Shipper in acquiring, at reasonable cost and after the exercise of
reasonable diligence: (a) any servitudes, rights of way grants,
permits, or licenses; (b) any materials or supplies for the
construction or maintenance of facilities; or (c) any permits or
permissions from any governmental agency; if such are required to
enable either of Panhandle or Shipper to fulfill its obligations
hereunder. Additionally, Panhandle shall be excused in whole or in
part, from its performance for inability to obtain Transportation
from or through third party pipelines. Either Panhandle or Shipper
claiming force majeure shall give to the other(s) notice and full
particulars of such force majeure by telephone or facsimile as soon
as reasonably possible after the occurrence of the case relied on,
and shall remedy such inability to perform with all reasonable
dispatch; provided, however, that such requirement or remedy shall
not require the settlement of strikes or lockouts by accession to the
demands of those opposing either of Panhandle or Shipper when such
course is inadvisable in the discretion of either of Panhandle or
Shipper.