Paiute Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/07/2003, Docket: RP04- 51-000, Status: Effective
Original Sheet No. 73A Original Sheet No. 73A : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
4. OPERATING PROCEDURES (Continued)
4.6. Interruptions or Curtailment of Service: (Continued)
e. In the event that diverted Low Priority volumes are
not sufficient to prevent High Priority curtailment,
then all High Priority Shipper(s) will share in the
High Priority curtailment beginning with Priority 2c
volumes. Curtailment will be pro rata within a given
priority and will continue until Priority 1 load is
protected across the Paiute system.
f. In the event an electric utility declares that cur-
tailment of Low Priority gas service would create a
fir Load Electrical Emergency, the volumes required
to forestall such Firm Load Electrical Emergency will
be deemed to be Priority 1 volumes for the purposes of
curtailment during the specific instance.
g. Firm Shipper(s) receiving diverted supplies will reim-
burse those Shipper(s) being curtailed for their costs
of acquiring and having transported such supplies in
addition to their incremental costs in acquiring their
least cost alternative energy needs available to the
Shipper during such period of curtailment.