Paiute Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/07/2003, Docket: RP04- 51-000, Status: Effective
First Revised Sheet No. 73 First Revised Sheet No. 73 : Effective
Superseding: Original Sheet No. 73
GENERAL TERMS AND CONDITIONS
(Continued)
4. OPERATING PROCEDURES (Continued)
4.6. Interruptions or Curtailment of Service: (Continued)
(5) In the event that the procedures under subsections (1)
through (4) above are either unavailable or insufficient,
Paiute will utilize LNG inventory to forestall any High
Priority curtailment. In this event, the Firm Shipper(s)
receiving this emergency service shall return equivalent
quantities of gas to the LNG inventory and/or to the
Shipper(s) whose inventory was utilized as soon as
practicable after the conclusion of the Catastrophic
Supply Failure. The method of returning such quantities
shall be determined by Paiute and the other Shipper(s)
involved.
(6) In the event service to High Priority customers is still
in jeopardy, then curtailment will be invoked on the
Paiute system.
a. Firm Shippers will be required to provide demand by
end use priority to Paiute for the specific day in
question.
b. Requests for voluntary curtailment will be made to
Low Priority customers. Low Priority customers will-
ing to be curtailed first will negotiate the compen-
sation to be paid by the Firm Shippers receiving the
diverted gas supplies. If voluntary curtailment is
not sufficient to satisfy supply needs, then the
curtailment order will proceed.
c. Capacity and supply used to satisfy Low Priority
loads will be curtailed and the supplies diverted
to the affected Firm Shipper(s).
d. Curtailment will continue until:
1. All Low Priority loads are curtailed; or
2. The volume required to forestall High Priority
curtailment is diverted.