Paiute Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/07/2003, Docket: RP04- 51-000, Status: Effective
First Revised Sheet No. 68 First Revised Sheet No. 68 : Effective
Superseding: Original Sheet No. 68
GENERAL TERMS AND CONDITIONS
(Continued)
4. OPERATING PROCEDURES (Continued)
4.4 Determination of Receipts and Deliveries: (Continued)
(c) The Receiving Party shall be responsible for all imbalances
in accordance with Section 5.4 of Paiute's General Terms and
Conditions.
4.5 Hourly Limitations:
Paiute, due to the configuration of its pipeline system, may need
to establish a limit upon the hourly quantity that it can deliver
at a particular Delivery Point. Any such limitation shall be spe-
cified in the executed Service Agreement between Shipper and
Paiute, and shall be set forth below:
Maximum Daily Maximum Hourly
Point of Delivery Quantity (Dth) Quantity (Dth)
_________________ ______________ ______________
Tracy Power Generator 53,982 2,249
Fort Churchill Power Generator 54,826 2,284
Avista Corporation 17,908 1,000
4.6. Interruptions or Curtailment of Service:
(a) Tests and Repairs: Paiute shall have the right to curtail or
interrupt the transportation of gas for Shipper when neces-
sary to test, alter, modify, enlarge or repair any facility
or property comprising a part of, or appurtenant to, Paiute's
pipeline system, or otherwise related to the operation
thereof. Paiute shall endeavor to cause a minimum of incon-
venience to Shipper because of such interruptions.
(b) Operational Control: Paiute shall retain full operational
control of its pipeline system and shall at all times be
entitled to schedule receipts and to operate its pipeline
system in a manner which is consistent with the obligations
and operating limitations set forth in Sections 2 and 5 of
Rate Schedule FT-1, Section 2 of Rate Schedule IT-1, Sections
2 and 6 of Rate Schedule LGS-1 and Sections 3, 4, 5, 6 and 10