Paiute Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-136-001, Status: Effective
First Revised Sheet No. 53 First Revised Sheet No. 53 : Effective
Superseding: Original Sheet No. 53
GENERAL TERMS AND CONDITIONS
(Continued)
1. DEFINITIONS (Continued)
1.17 "Feedstock Gas" is defined as natural gas used as a raw material
for its chemical properties in creating an end product.
1.18 "FERC" or "Commission" means the Federal Energy Regulatory
Commission or any successor entity thereto.
1.19 "Fire Protection Use" is defined as natural gas used by and for the
benefit of fire fighting agencies in the performance of their
duties.
1.20 "Firm Load Electrical Emergency" (1) a condition where the
curtailment and diversion of scheduled firm capacity and supply
from Low Priority electrical generation demand, would create the
situation where the electric utility, in order to comply with the
curtailment order, would be required to shed residential firm
electric load; and (2) an officer of the affected utility attests
that no alternate source of electricity is available. As soon as
reasonably practicable after the emergency occurs, the electric
utility must provide Paiute with documentation that all other
sources of electrical energy were being utilized (i.e., coal-
fired, purchased power, fuel oil, etc.).
1.21 "Gallon" means a unit of volume in the U.S. Customary System, used
in liquid measurement equal to two hundred thirty-one (231) cubic
inches or four (4) quarts.
1.22 "Gas or Natural Gas" means any mixture of hydrocarbons or of
hydrocarbons and non-combustible gases, in a gaseous state,
consisting essentially of methane or a mixture of propane and air.
Such gas may be either in its natural state produced from wells,
including casing head and residue gas, or after manufacture or
other methods of producing synthetic gas.