Gas Transmission Northwest Corp.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/06/2003, Docket: RP04- 23-000, Status: Effective
Original Sheet No. 200 Original Sheet No. 200 : Superseded
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
29. FLEXIBLE RECEIPT AND DELIVERY POINTS
29.1 Firm Service
(a) Addition of a Receipt Point
Any firm Shipper receiving service under Part 284 of the
Commission's regulations is entitled to use the receipt
point specified in its service agreement as a primary
receipt point. A firm Shipper may add a secondary
receipt point at any time during the life of the contract
provided that secondary receipt point is within the
Shipper's Primary Path.
Firm Shippers who are billed under a reservation charge
and a delivery rate will continue to be billed
reservation charges based on the primary receipt point
while delivery rates, including fuel, will be calculated
on the receipt point actually used.
To the extent additional meter station capacity or other
facilities are required to effect the receipt point
change, GTN will construct the additional capacity
consistent with Paragraph 18.5.
(b) Changing a Receipt Point
A firm Shipper may change primary receipt points to a
different receipt point within its Original Primary Path
but will continue to be billed reservation charges based
on the original primary receipt point. Changes in receipt
points will be permitted provided sufficient receipt point
capacity exists at the receiving meter station and subject
to any operating constraints. To the extent additional
meter station capacity or other facilities are required to
effect the receipt point change, GTN will construct
the additional capacity at the firm Shipper's expense
consistent with Paragraph 18.5.
(Continued)