Gas Transmission Northwest Corp.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-684-000, Status: Effective
Third Revised Sheet No. 186 Third Revised Sheet No. 186
Superseding: Second Revised Sheet No. 186
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
28. CAPACITY RELEASE (Continued)
28.6 Bidding for a Parcel (Continued)
(b) Submitting a Bid (Continued)
(8) An affirmative statement that Replacement Shipper agrees to
be bound by the terms and conditions of Rate Schedule FTS-1
and GTN's capacity release provisions in its tariff.
(9) Whether the bid is a contingent bid and the contingencies
which must be satisfied by the date specified by the
Releasing Shipper in its posting of the Parcel.
(c) Confirmation of Bids
It is the Replacement Shipper's sole responsibility to confirm
the correctness of the submitted bid and to take any corrective
action necessary by resubmitting a bid when notified of an
invalid or incomplete bid by GTN. This must be done before the
close of the Bid Period.
(d) Withdrawn or Revision of Bids
A previously submitted bid may be withdrawn or revised and
resubmitted at any time prior to the close of the Bid Period
with no obligation on the Replacement Shipper's part. In
accordance with NAESB Standard 5.3.15, Version 1.8, bids cannot
be withdrawn after the bid period ends. Resubmitted bids must
be equal to or greater in value than the initial bids. Lower
valued bids will be invalid. In accordance with NAESB Standard
5.3.13, Version 1.8, bids should be binding until written or
electronic notice of withdrawal is received by the capacity
release service provider.
(Continued)