Gas Transmission Northwest Corp.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/06/2003, Docket: RP04- 23-000, Status: Effective
Original Sheet No. 178 Original Sheet No. 178 : Superseded
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
28. CAPACITY RELEASE (Continued)
28.3 Notice Requirements (Continued)
(e) The term of the release, identifying the date
release is to begin and terminate. The minimum
release term acceptable to GTN shall be one day.
(f) Whether the Releasing Shipper is willing to
consider release for a shorter period of time than
that specified in (e) above and if so, the minimum
acceptable period of release.
(g) The receipt and delivery point.
(h) Whether Option 1, 2, or 3 shall be used to determine
the highest valued bid (see Section 28.7(a) for a
description of bid evaluation options 1, 2 and 3).
(i) Whether the Releasing Shipper wants GTN to market
its released capacity.
(j) Whether the Releasing Shipper requests to waive the
creditworthiness requirements and agrees in such
event to remain liable for all charges, or, if the
release is for one year (365 days) or less, whether
Releasing Shipper requests that the creditworthiness
provisions of Paragraph 18.3(A)(1)(c) shall apply.
(k) Whether Releasing Shipper is a marketing or other
affiliate of GTN.
(l) If release is a prearranged release, the
Prearranged Shipper must be qualified pursuant to
the criteria of Paragraph 28.6(a) unless waived
above. Releasing Shipper shall include the
Prearranged Shipper bid information pursuant to
Paragraph 28.6(b) with its release information and
shall indicate whether the Prearranged Shipper is
affiliated with GTN or the Releasing Shipper.
(m) Any special nondiscriminatory terms and conditions
applicable to the release.
(Continued)