Gas Transmission Northwest Corp.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/03/2004, Docket: RP04-440-000, Status: Effective
First Revised Sheet No. 103 First Revised Sheet No. 103 : Effective
Superseding: Original Sheet No. 103
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
1. DEFINITIONS (Continued)
1.16 Bid Period: The period of time during which a Replacement
Shipper may bid to contract for a parcel which has been
posted for release by a Releasing Shipper.
1.17 Parcel: The term utilized to describe an amount of capacity,
expressed in Dth/d, from a specific receipt point to a
specific delivery point for a specific period of time which
is released and bid on pursuant to the capacity release
provisions contained in Paragraph 28 of these Transportation
General Terms and Conditions.
1.18 Primary Release: The term used to describe the release of
capacity by a Releasing Shipper receiving service under a
Part 284 firm transportation rate schedule.
1.19 Secondary Release: The term used to describe the release of
capacity by a Replacement Shipper receiving service under a
Part 284 firm transportation rate schedule.
1.20 Bid Reconciliation Period: The period of time subsequent
to the Bid Period during which bids are evaluated by GTN.
1.21 Match Period: The period of time subsequent to the Bid
Reconciliation Period and before the notification deadline
for awarding capacity for Prearranged Deals that require
bidding. During this period, the Prearranged Shipper may match
any higher bids for the Parcel.
1.22 Mainline Facilities: The term "Mainline Facilities" shall
mean the 36-inch and 42-inch mains and appurtenant
facilities extending from the interconnection with the
pipeline facilities of TransCanada PipeLines Limited B.C. System
and Foothills Pipe Lines (South B.C.) Ltd., near Kingsgate,
British Columbia to the interconnection with the pipeline
facilities of Pacific Gas and Electric Company near Malin,
Oregon.
(Continued)