Gas Transmission Northwest Corp.
Third Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-795-000, Status: Effective
Original Sheet No. 23B Original Sheet No. 23B
/18 (Continued)
2) an allowance for the per Dth cost of delivery of volumes on the GTN
System equal to the maximum delivery rate applicable under GTN's FTS-1
Tariff for the volumes transported, multiplied by the distance
transported.
3) an allowance for ACA of $0.0019/Dth.
The allowance for GTN System fuel shall be computed as follows:
The Gas Daily Midpoint Price for Kingsgate, BC multiplied by {[1.0/(1.0-
the GTN System fuel rate)] minus 1.0}, where the GTN System fuel rate
equals GTN's applicable mileage-based fuel rate multiplied by the
mileage of the path of the gas transported.
Reservation Rate
On any day when the foregoing Index Rate Calculation produces a result less
than $0.06/Dth, the Reservation Rate shall be deemed to be $0.02/Dth. On any
day when the foregoing Index Rate Calculation produces a result greater than
or equal to $0.06/Dth and less than or equal to $0.10/Dth, The Reservation
Rate shall be deemed to be equal to the calculated per Dth Reservation Rate
minus $0.04/Dth. On any day when the foregoing Index Rate calculation
produces a result greater than $0.10/Dth, the Reservation Rate shall be equal
to six cents ($0.06) plus eighty per cent (80%) of the difference between the
result of the Index Rate Calculation and ten cents ($0.10). To determine the
Index Rate Calculation applicable to volumes not nominated or scheduled, the
Kingsgate, BC to Malin, OR mileage will be applied to the calculation's
mileage-based components.
Other Charges
In addition to the Reservation Rate as calculated herein, EDF Trading shall
pay the Delivery Rate for volumes transported equal to the maximum delivery
rate, plus the ACA charge as applicable under GTN's FTS-1 Tariff. EDF Trading
shall provide fuel in kind in accordance with GTN's FTS-1 Tariff.
Renegotiation Request
In the event that the indices for PG&E, Malin or Kingsgate, BC are not
published on any given day (other than a weekend or holiday), prices will be
determined based on the average of last published information for such indices
and the next published information for such indices. In the event that the
indices for PG&E, Malin or Kingsgate, BC are not published on at least three
business days within a span of six business days, either party may request
negotiation of a replacement rate structure (a "Renegotiation Request"). Upon
such Renegotiation Request, GTN and EDF Trading will use diligent, good faith
efforts to come to a mutually agreeable replacement rate structure. Firm
Transportation Service Agreement F-10881 will terminate on the fifteenth day
following a Renegotiation Request in the event the parties do not agree on a
replacement rate structure prior to such termination.