Questar Overthrust Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/25/2007, Docket: RP07-360-000, Status: Effective
Original Sheet No. 76 Original Sheet No. 76 : Effective
GENERAL TERMS AND CONDITIONS
12.3 Flexible use of alternate receipt and delivery points. A firm
Shipper, or any replacement Shipper, may flex to or use any receipt or
delivery point on an alternate basis at which capacity is available. However,
a replacement Shipper may not add or delete primary receipt and delivery
points or change Shipper's RDC at primary receipt and delivery points unless
the terms of Shipper's release allow for such.
12.4 Priority at alternate receipt and delivery points. A Shipper's
priority at alternate points shall be determined according to § 11.
12.5 Nominations to and rights of firm and replacement Shippers at
alternate points. A firm or replacement Shipper must follow Overthrust's
nomination procedures to flex to alternate receipt and delivery points. A
firm or replacement Shipper's right to service at alternate receipt and
delivery points shall be subordinate to the primary rights of other firm
Shippers at those points, but as provided by § 11 to this tariff, will have
priority over interruptible transportation and authorized overrun service.
12.6 Right of Shippers to renominate if bumped. If a firm Shipper or
replacement Shipper's nomination at a receipt or delivery point requires
bumping of an interruptible Shipper currently using that receipt or delivery
point, Overthrust will notify the interrupted Shipper and allow that Shipper
to nominate the requested transportation volumes at another receipt or
delivery point subject to the intra-day nomination procedures set forth in §
15 of these General Terms and Conditions.
12.7 Availability of receipt and delivery point information.
Replacement Shippers may obtain information through Questline or Overthrust's
web site regarding Overthrust's ability to provide transportation service
between the receipt and delivery points desired by the replacement Shipper.
13. MEASUREMENT
13.1 References. The following reports and standards stated in this §
13 will be used by Overthrust when applying measurement practices. Overthrust
may adopt updates to these reports and standards, as amended from time to
time.
American Gas Association, AGA Report No. 3, Orifice Metering of Natural Gas
and Other Related Hydrocarbon Fluids, Part 2, Specification and Installation
Requirements (AGA Report No. 3, Part 2).
American Gas Association, ANSI B109.3, Rotary-Type Gas Displacement Meters
(AGA ANSI B109.3).