Questar Overthrust Pipeline Company

Second Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/25/2007, Docket: RP07-360-000, Status: Effective

Original Sheet No. 52 Original Sheet No. 52 : Effective

 

GENERAL TERMS AND CONDITIONS

 

8.3 Criteria of Release. A releasing Shipper may specify how bids for

released capacity are to be evaluated to determine the best offer. A Shipper

must notify Overthrust of the criteria by which volumetric bids are to be

evaluated. These criteria must be objectively stated, applicable to all

potential bidders and nondiscriminatory. Unless the offer to release is

withdrawn according to § 8.22, the releasing Shipper shall not be entitled to

reject a bid that meets its specified criteria.

 

8.4 Qualification for Participation in the Capacity Release Program.

Any party wishing to become a bidding Shipper must prequalify by satisfying

the creditworthiness provisions and Questline access and signatory

requirements of this tariff prior to submitting a bid for capacity.

Notwithstanding Shipper's qualification to participate in Overthrust's

capacity release program, Overthrust does not guarantee to the releasing

Shipper that the replacement Shipper will pay for the contracted-for service.

 

8.5 Notice By Shipper Electing to Release Capacity. A releasing

Shipper must post a notice via Questline that it elects to release firm

capacity. The notice must state:

 

(a) The releasing Shipper's name, contract number and the name

and phone number of the individual responsible for authorizing the release of

capacity.

 

(b) The maximum and minimum RDC to be released stated in

Dth/day.

 

(c) The primary receipt and delivery points.

 

(d) Whether capacity will be released on a firm or recallable

basis. If on a recallable basis, the terms under which the capacity may be

recalled.

 

(e) Whether Shipper will accept contingent bids, the

contingencies acceptable to Shipper, the deadline by which all contingencies

must be met and whether Overthrust should award capacity to the next highest

bidder if contingencies are not met.

 

(f) The beginning and ending dates of the release.