Questar Overthrust Pipeline Company
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/06/2009, Docket: RP09-138-000, Status: Effective
Second Revised Sheet No. 5 Second Revised Sheet No. 5
Superseding: First Revised Sheet No. 5
Footnotes
1/ Released capacity may be sold at a volumetric rate. Shippers
releasing capacity on a volumetric basis may not specify a rate above the
maximum rate stated on this Statement of Rates, except for short-term
capacity releases for a term of one year or less that are not subject to the
maximum rate, and must notify Overthrust of the criteria by which bids are to
be evaluated.
2/ Refer to § 7 of the General Terms and Conditions.
3/ Refer to § 16 of the General Terms and Conditions.
4/ If on any day Shipper exceeds its RDC without Overthrust's consent,
an evaluation will be made as to whether it is a critical or non-critical
event, i.e., whether or not the overrun caused operational problems. Shipper
shall then pay the indicated rate for the unauthorized overrun service. Any
associated revenue, above administrative costs, will be credited to all non-
offending shippers.
5/ Usage charges are applicable to transportation services that are
released at a volumetric rate.
6/ Short-term capacity releases for a term of one year or less are
not subject to the maximum rate.
NOTE: The monthly rates stated on Overthrust's Statement of Rates may
be converted to a daily rate by multiplying the monthly base tariff rate
times the number of months in the rate period and dividing the result by the
number of days in the rate period. The result is rounded to the fifth
decimal place.