Northwest Pipeline Corporation G P
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-607-000, Status: Effective
First Revised Sheet No. 231 First Revised Sheet No. 231
Superseding: Original Sheet No. 231
GENERAL TERMS AND CONDITIONS
(Continued)
14. OPERATING CONDITIONS (Continued)
14.12 Fuel Gas Reimbursement. NAESB WGQ Nominations Related Standards
1.3.15, 1.3.16 and 1.3.28 through 1.3.31 (Version 1.8) will apply and
are incorporated by reference.
In addition to the payments for transportation and storage,
Shipper will reimburse Transporter for Shipper's pro rata share of gas
used for fuel, including lost or gained and unaccounted-for gas, based
on a fuel use requirements factor (Factor) as set forth on Sheet No. 14.
The Factor for Rate Schedules TF-1, TF-2, TI-1 and DEX-1 (Transportation
Rate Schedules) and the Factor(s) for Rate Schedules TFL-1 and TIL-1
(Lateral Rate Schedules) will be determined semi-annually to become
effective on April 1 and on October 1 of each year. A separate Factor
will be determined for each Designated Lateral under the Lateral Rate
Schedules. The Factor for Rate Schedules SGS-2F and SGS-2I,
(Underground Storage Rate Schedules) and Rate Schedules LS-1, LS-2F and
LS-2I (LNG Storage Rate Schedules) will be determined annually to become
effective on April 1 of each year. Fuel usage and lost or gained and
unaccounted-for volumes incurred at the Jackson Prairie Storage Project
attributable to system balancing requirements will be included in the
Factor for the Transportation Rate Schedules. The Factor for the
Transportation Rate Schedules and the Factor(s) for the Lateral Rate
Schedules may also include a component for volumetric increases or
decreases to Transporter's system occurring during the prior calendar
year as described below. The Factors will be calculated as follows:
(a) Projected fuel usage volumes will be determined for services
under the Transportation Rate Schedules and for services on each
separate Designated Lateral under the Lateral Rate Schedules for
the upcoming six months beginning April 1 or October 1. Projected
fuel usage will be determined for services under the Underground
Storage Rate Schedules and for services under the LNG Storage Rate
Schedules for the upcoming twelve months beginning April 1.
(b) Projected lost or gained and unaccounted-for volumes will be
determined for services under the Transportation Rate Schedules
and for services on each separate Designated Lateral under the
Lateral Rate Schedules for the upcoming six months beginning April
1 or October 1. Projected lost or gained and unaccounted-for
volumes will be determined for services under the Underground
Storage Rate Schedules and for services under the LNG Storage Rate
Schedules for the upcoming twelve months beginning April 1.