Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2007, Docket: RP07-648-000, Status: Effective
Sixth Revised Sheet No. 301A Sixth Revised Sheet No. 301A : Effective
Superseding: Fifth Revised Sheet No. 301A
GENERAL TERMS AND CONDITIONS
(iv) Northern shall determine at the time of filing its PRAs, based on
its system configuration and operational experience whether
mainline compression was used in connection with transactions
involving certain MIDS. At the time of filing, Northern will
provide a full explanation of any changes in system configuration
and operational experience related to the use of mainline
compression, and parties will have the right to challenge any
proposed changes in the PRA filing.
Market Area "M/L Fuel Percentage" (Mid 17)
------------------------------------------
The Market Area M/L fuel calculation is one Fuel Percentage
applicable to all of Northern's Market Area receipts. All fuel consumed
at facilities in the Market Area is aggregated for the applicable season,
as adjusted for known and measurable changes, and divided by all
throughput received into the Market Area over the same time period.
FDD Storage Fuel
----------------
The FDD Storage Fuel calculation is one Fuel Percentage applicable to FDD
volumes injected during the Injection Period. The FDD Storage Fuel
Percentage is calculated by dividing the applicable twelve-month actual
storage fuel, as provided for in the PRA Settlement, by the projected FDD
Storage injections during the Injection Period.
Unaccounted-For (UAF)
---------------------
The Unaccounted-for percentage is calculated by dividing the
twelve-month actual unaccounted-for gas for the respective twelve-month
period ending December 31, by the throughput for the same twelve-month
period. UAF is not collected for transportation from any receipt point in
any MID to the delivery point at MID 16B.