Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/22/2003, Docket: RP03-398-000, Status: Effective
Second Revised Sheet No. 278 Second Revised Sheet No. 278 : Effective
Superseding: First Revised Sheet No. 278
GENERAL TERMS AND CONDITIONS
b) Such reduction is conditioned on Northern's reasonable
verification that the firm industrial customer was and is
being served exclusively by Northern on a firm basis. A
hardship request may be submitted at any time prior to or
after the actual loss of load provided the date on which the
load was lost is specified.
A TF Shipper which is eligible for hardship relief shall
submit to Northern an affidavit identifying the lost
load(s), the date on which such load was lost, and the firm
entitlement level associated with such lost load. The TF
Shipper shall specify the level of service within each TF
tier which should be reduced a result of the loss.
Northern shall reduce the level of service within each TF
tier as specified by the TF Shipper to the first of the
month following the date on which the load was lost if the
hardship request was filed within thirty (30) days of such
loss; otherwise, to the first of the month following the
date on which its hardship request was actually filed.
c) To the extent that the firm industrial customer does not
exclusively purchase or transport all volume from Northern,
Northern will provide hardship relief on a prorata basis to
its portion of all the TF Shippers firm requirements if the
TF Shipper receives commensurate relief from all other
pipelines. However, if Northern bypasses directly to a firm
enduser of a TF Shipper, Northern will provide hardship
relief equal to the firm quantity associated with such
bypass.
d) Paragraphs a and b will also apply to a firm direct customer
of Northern.
e) Pregranted abandonment authorization shall be in effect for
reductions made pursuant to this Section 42.